Jump to the content zone at the center

Will residents be consulted or notified before the installation of FTTH utility boxes?

The FTTH contractor will have to obtain approval from borough offices and competent authorities to conduct joint inspections at planned locations of the utility boxes before installing them. The boxes should be set up at inconspicuous spots, avoiding sidewalks and blending into the environment (inside flowerbeds, corner walls, or tree pits). Approval should be obtained before the facility is installed.