What are the average sewage capacity and the maximum sewage capacity treated by two sewage treatment plants every day?
Average sewage capacity designed per day=500,000 m³; maximum sewage capacity designed per day=600 thousand m³.
Phase I of the two-stage project (completed): Average sewage capacity designed per day=150,000 m³; maximum sewage capacity designed per day=225,000 m³. Phase I & II of the two-stage project: Average sewage capacity designed per day=240,000 m³; maximum sewage capacity designed per day=360,000 m³.